ENTERPRISE PROCESS WORKFLOW

Product Engineering Life Cycle

Ascenten adheres to a rigorous, comprehensive product engineering lifecycle — translating ideas into high-reliability, market-ready embedded electronic products. Click any stage to explore details.

Product Engineering Life Cycle Workflow Diagram
PHASE 01: REVIEW PROJECT REQUIREMENTS
ACTIVE STAGE

Review Project Requirements (Feasibility Study)

Document features and functions
Differentiate hard requirements versus trade-off areas
Proposal: If requirements are sufficiently clear, Ascenten prepares a proposal outlining the project scope, assumptions made, items needed from the customer, project deliverables, project logistics, along with time and cost estimates
TECHNICAL RESEARCH
Establish technical specifications
Research certification and approvals
Evaluate suitable technologies and licensing requirements
Establish preliminary block diagram
Estimate unit manufacturing cost
Evaluate R&D cost (Non-recurring engineering) and project schedule

Design and Development

Study of specific standards
Algorithm design and verification
Selection of electronic components
Engineering tradeoffs: cost/size/power/robustness/function
Document software architecture
Perform small scale trials, if any
Establish R&D test procedure
PROTOTYPE DEVELOPMENT
Designing schematics
DFM analysis
Layout specifications, requirements, and design
Signal Integrity simulations
Product sketches and enclosure design
Mould, tooling, and mechanical parts development
Flow and thermal simulations
Fabricate prototypes
Functional, electrical, and reliability tests and review
To minimize prototype testing, Ascenten utilizes several modeling and simulation tools to identify potential problems before a prototype board is built. Different types of modeling include investigating overall system performance, timing analysis, logic simulation, analog circuit modeling, heat dissipation, and EMI radiation. Ascenten builds and tests prototypes to ensure products meet their requirements.
PRE-CERTIFICATION MODEL
Review test plans, layout, and manufacturability
Submission of sample to authorities for evaluation
Climatic and harsh conditions tests and review
PRODUCTION MODEL (GOLDEN SAMPLE)
Engineering review on suitability
Freeze design
Freeze tooling and mechanical parts
Fabricate and deliver golden samples
With a final design tested and debugged, Ascenten can manage small pilot runs and perform field acceptance testing

Documentation and Delivery of IPs

Deliver a design description document
Deliver Test Plans and Results (R&D Tests & Results, Factory Acceptance Tests)
Schematics, source codes, hex files, layout files
Tooling drawings

Production

Establish production procedure
Set up automated test bench, if necessary
Produce a pilot batch
Ramp up production

Warranty and Future Upgrades

Analyse statistical market performance
Establish upgrade items and schedule

Customer Feedback

Ascenten will conduct post project interviews to ensure your feedback is captured for future projects and to allow us to track quality metrics.

Success Stories

Develop prototypes from Gerber files for an industrial product

Scope of Work:

  • Procurement of components
  • Planning layout of components
  • Automatic Pick & Place board assembly
  • Quality check
  • Embedded software testing
  • Prototype release
Gerber Files Prototype
  • Implemented DLMS stack and metering objects in existing code while replacing a bulky communications standard, retaining functionalities and security features
  • Engagement was urgent due to customer sales deadlines
  • Successfully delivered working and tested code for an ultra-low-power microcontroller, including:
    • Porting DLMS objects for smart meter reading
    • GSM integration for wireless communication
  • Engagement: Onsite & Offsite, 24 weeks
DLMS Smart Metering

Contact Us

We would really like to hear from you and answer any questions. Please email us at info1@ascenten.net
or call us on

India Mobile: +91-89800 00973

India Landline: +91-79-2646 4646

refresh